COOL-FIT 2.0/4.0 Transition cap PE100/brass Rp
The Georg Fischer COOL-FIT 2.0/4.0 transition cap PE100/brass provides a permanent, engineered pipeline termination with an integrated auxiliary tapping point for pre-insulated plastic piping systems. Designed for chilled water distribution, industrial cooling, and HVAC secondary refrigeration loops, this SDR11 PN16 fitting terminates pipe runs while offering an internal Rp 1/2" female thread for instrumentation and vents. It ensures high operational reliability across industrial and commercial facilities.
Technical specifications
This transition cap combines an SDR11 PE100 spigot body with an embedded female Rp 1/2" dezincification-resistant brass insert. The dual-material assembly provides full hydrostatic containment up to 16 bar for liquid cooling media.
- Nominal pressure rating: 16 bar (PN16 at SDR11)
- Operating temperature range: 0 degrees Celsius to +60 degrees Celsius
- Thread interface: Female parallel thread Rp 1/2" to ISO 7
- Materials: PE100 polyethylene body with CuZn40Pb2 brass insert
- Internal sealing: Factory-fitted EPDM elastomeric O-ring gasket
- Operational lifespan: Minimum 25-year maintenance-free service life
Applications
The component is engineered for secondary cooling loops and closed-circuit refrigeration systems conveying chilled water or water-glycol mixtures. It serves simultaneously as a dead-end cap and an active tapping connection.
Typical installations include data center cooling networks, commercial air conditioning infrastructure, process refrigeration in food and beverage facilities, and industrial manufacturing plants. The integrated Rp 1/2" female port facilitates direct mounting of pressure gauges, temperature probes, air release valves, drainage valves, and sampling cocks without requiring additional tapping saddles or mechanical pipe branching.
Installation and jointing
The transition cap features a calibrated SDR11 PE100 spigot end designed for jointing with electrofusion couplers or butt fusion equipment. This creates a fully homogeneous, leak-proof weld directly onto the carrier pipe.
When integrating into pre-insulated COOL-FIT systems, installers benefit from fast alignment and standard electrofusion procedures. The factory-integrated EPDM O-ring maintains an airtight and watertight internal seal between the polyethylene body and the brass component, preventing leaks caused by thermal cycling between 0 degrees Celsius and +60 degrees Celsius. The non-corroding polyethylene surface prevents scale accumulation, incrustation, and internal flow disruption.
The Georg Fischer COOL-FIT 2.0/4.0 transition cap PE100/brass provides a permanent, engineered pipeline termination with an integrated auxiliary tapping point for pre-insulated plastic piping systems. Designed for chilled water distribution, industrial cooling, and HVAC secondary refrigeration loops, this SDR11 PN16 fitting terminates pipe runs while offering an internal Rp 1/2" female thread for instrumentation and vents. It ensures high operational reliability across industrial and commercial facilities.
Technical specifications
This transition cap combines an SDR11 PE100 spigot body with an embedded female Rp 1/2" dezincification-resistant brass insert. The dual-material assembly provides full hydrostatic containment up to 16 bar for liquid cooling media.
- Nominal pressure rating: 16 bar (PN16 at SDR11)
- Operating temperature range: 0 degrees Celsius to +60 degrees Celsius
- Thread interface: Female parallel thread Rp 1/2" to ISO 7
- Materials: PE100 polyethylene body with CuZn40Pb2 brass insert
- Internal sealing: Factory-fitted EPDM elastomeric O-ring gasket
- Operational lifespan: Minimum 25-year maintenance-free service life
Applications
The component is engineered for secondary cooling loops and closed-circuit refrigeration systems conveying chilled water or water-glycol mixtures. It serves simultaneously as a dead-end cap and an active tapping connection.
Typical installations include data center cooling networks, commercial air conditioning infrastructure, process refrigeration in food and beverage facilities, and industrial manufacturing plants. The integrated Rp 1/2" female port facilitates direct mounting of pressure gauges, temperature probes, air release valves, drainage valves, and sampling cocks without requiring additional tapping saddles or mechanical pipe branching.
Installation and jointing
The transition cap features a calibrated SDR11 PE100 spigot end designed for jointing with electrofusion couplers or butt fusion equipment. This creates a fully homogeneous, leak-proof weld directly onto the carrier pipe.
When integrating into pre-insulated COOL-FIT systems, installers benefit from fast alignment and standard electrofusion procedures. The factory-integrated EPDM O-ring maintains an airtight and watertight internal seal between the polyethylene body and the brass component, preventing leaks caused by thermal cycling between 0 degrees Celsius and +60 degrees Celsius. The non-corroding polyethylene surface prevents scale accumulation, incrustation, and internal flow disruption.
| Size | SKU | Property | U.M. |
Price
incl. 21% VAT
VAT is calculated at checkout. It depends on who is buying (private person or company) and where the order is shipped, so the final rate may differ from the one shown here.
|
Availability | Add To Cart |
|---|---|---|---|---|---|---|
|
D
32 mm
Thread
1/2"
|
738960008 |
Material: PE100 / Brass
PN: 16 Bar
|
pcs | On Request |
Ships in 24 hours
Ships in 7-10 days
Ships in 10-15 days
Max stock reached
Please call
|
|
|
D
40 mm
Thread
1/2"
|
738960009 |
Material: PE100 / Brass
PN: 16 Bar
|
pcs | On Request |
Ships in 24 hours
Ships in 7-10 days
Ships in 10-15 days
Max stock reached
Please call
|
|
|
D
50 mm
Thread
1/2"
|
738960010 |
Material: PE100 / Brass
PN: 16 Bar
|
pcs | On Request |
Ships in 24 hours
Ships in 7-10 days
Ships in 10-15 days
Max stock reached
Please call
|
|
|
D
63 mm
Thread
1/2"
|
738960011 |
Material: PE100 / Brass
PN: 16 Bar
|
pcs | On Request |
Ships in 24 hours
Ships in 7-10 days
Ships in 10-15 days
Max stock reached
Please call
|
|
|
D
75 mm
Thread
1/2"
|
738960012 |
Material: PE100 / Brass
PN: 16 Bar
|
pcs | On Request |
Ships in 24 hours
Ships in 7-10 days
Ships in 10-15 days
Max stock reached
Please call
|
|
|
D
90 mm
Thread
1/2"
|
738960013 |
Material: PE100 / Brass
PN: 16 Bar
|
pcs | On Request |
Ships in 24 hours
Ships in 7-10 days
Ships in 10-15 days
Max stock reached
Please call
|
|
|
D
110 mm
Thread
1/2"
|
738960014 |
Material: PE100 / Brass
PN: 16 Bar
|
pcs | On Request |
Ships in 24 hours
Ships in 7-10 days
Ships in 10-15 days
Max stock reached
Please call
|
|
|
D
140 mm
Thread
1/2"
|
738960016 |
Material: PE100 / Brass
PN: 16 Bar
|
pcs | On Request |
Ships in 24 hours
Ships in 7-10 days
Ships in 10-15 days
Max stock reached
Please call
|
|
|
D
160 mm
Thread
1/2"
|
738960017 |
Material: PE100 / Brass
PN: 16 Bar
|
pcs | On Request |
Ships in 24 hours
Ships in 7-10 days
Ships in 10-15 days
Max stock reached
Please call
|
|
|
D
225 mm
Thread
1/2"
|
738960020 |
Material: PE100 / Brass
PN: 16 Bar
|
pcs | On Request |
Ships in 24 hours
Ships in 7-10 days
Ships in 10-15 days
Max stock reached
Please call
|
|